LT Automation successfully supplied, installed, configured and commissioned the COEN® dual fuel (Natural Gas/Fuel Oil 6) burners for the PREPA South Coast Plant LNG Conversion. This major project included the modification of the control logic and displays to allow for duel fuel operation.