LTAutomation provided the service to supply, install, configure and commission the control infrastructure of the Foxboro I/A DCS at the San Juan, Palo Seco and Aguirre Power Stations for over 1200MW of generating capacity. This project included the modification of the control logic and displays to allow for duel fuel operation using Fuel Oil 6 and Natural Gas.